Final outputs – Define Demonstration requirements and Planning

The final outputs of task 2.1 include:

  1. A generic implementation plan of all technical Work Packages, a data interchange identification between Work Packages and Tasks and a respective detailed workflow within each Work Package.
  2. The identification of preliminary requirements and respective boundaries related to the demonstrator from the i) vessel owners’, ii) tank manufacturers’ and designers’ and iii) Classification Societies’ and Risk & Safety related partners’ point of view.
  3. The determination of potential knowledge transfer from the demonstrator assessment to the desktop studies stage.