A public project website will be the main access point for all the project’s activities and outputs, where its public section will contain an overall description of the project, the public deliverables, as well as an agenda with events, papers and articles carried out by the partners of the project. This will on the one hand reinforce the branding and the importance of the project for the EU shipbuilding sector, and on the other hand will allow the public project results and any relevant news items and press releases to be shared with the relevant stakeholders and with the general public alike.Τhe project website that will be continuously expanded during the whole project duration. Its scope is to disseminate the progress of the project carried out in the frame of WP11 that will be used for the promotion, increase of awareness & degree of visibility and to make the industry and the general public aware of the results of the NH3CRAFT project.
The project website will include links to be promoted via the social media channels (LinkedIn, Twitter, Youtube etc.) of the project itself and that of the project partners, but also through the partners’ websites. This provides public information to external parties by providing general project information, public deliverables, newsletters, and information about events the members of the NH3CRAFT consortium attend.
To maximize the project impact and cost efficiency, project stationary, including general (PowerPoint) presentation, (e-)newsletters, brochures/and leaflets, a poster/rollup, a white paper, project video, scientific publications and any other dissemination materials will be developed for promoting the research being carried out during selected fairs and exhibitions.
The project brochure, which will be developed and the final project video also will be captured in an impactful visual manner the entire research results completed by NH3CRAFT and the end-product that will be available to the industry.
NH3CRAFT first flyer and poster are already prepared and will be used in any conference that a consortium partner will be involved in. It will be used as a specific communication strategy (message to the public etc.). Last but not least, the first deliverable D11.6 regarding the project website is prepared and uploaded to the system and in month 6 will be delivered the D11.2 which is about the communication strategy and live register.